Approval of Rehabilitation and Resettlement plan scheme in connection with the acquisition of land for development of Integrated Check Post (ICP) at Anandapara of Doulbari Mouja under Sabroom Sub-Division
Title | Date | View / Download |
---|---|---|
Approval of Rehabilitation and Resettlement plan scheme in connection with the acquisition of land for development of Integrated Check Post (ICP) at Anandapara of Doulbari Mouja under Sabroom Sub-Division | 10/06/2021 | View (4 MB) |