MINUTES OF THE MONTHLY DEVELOPMENT MEETING HELD
ON
05.1.07
WITH THE BDOs & LINE DEPARTMENTS OF SOUTH
TRIPURA DISTRICT AT 3.00 PM IN THE OMPI R. D. BLOCK
OFFICE
List of participants is shown in
Annexure – A.
Chairman,
Ompi BAC; ADM (South); PD, DRDA (South); all the BDOs and the Line Departments
Officers assembled at Amarpur Dak-Bungalow at 9 A.M. The team under the
leadership of DM & Collector, South Tripura conducted inspection of RD and
other Development works under Ompi RD Block. Thereafter, monthly Development
review meeting chaired by the DM & Collector, (South) Started at 3 P.M. in
the meeting Hall of Ompi RD Block office.
After detail discussions and review of the performance of various
schemes, following decisions were taken :
1. WATER
BODIES:
1) All BDOs have
been given 5 lakhs under HTM for creation of water bodies of at least 5 hectare
in total area, where each water body area should not be less than 1 hectare. It
appears that work has not been started by the BDOs. BDOs should start the work
immediately and complete within March’07. BDOs were advised to maintain the
bundh of the water bodies wide enough and they may also plan plantation on the
bundh to give it strength.
( Action : all BDOs )
2) A detailed report
in connection with safety aspect of the existing water bodies from Earthquake
point of view, only for the water bodies which are above 1 hectare, is still
pending from the BDOs. The same be submitted immediately.
( Action : all BDOs
)
3) BDOs may issue
work order in favour of VLW/Agri Asstt., if necessary and in such case, copy is
to be marked to Supdt. Of Agriculture concerned.
( Action: all BDOs
)
4) BDO,
Hrishyamukh is to send the names of two ongoing water bodies being created.
( Action: BDO,
Hrishyamukh)
2.
IRRIGATION AND NON-IRRIGATION PLAN:
1) All BDOs were further requested to
identify at least one site to create irrigation facilities in non-irrigable
areas and submit the same by 31st Dec’06. Report is yet to be
received from the BDOs. The same should be submitted positively by
31st Jan’07.
( Action : All BDOs
)
3.
IRRIGATION:
1) The BDOs were
instructed to take action in respect of creation of irrigation facilities as per
joint action plan.
(Action : all BDOs
)
2)
Executive Engineer, RD (South) informed in the meeting that rate of
pumpset brand wise against target of 2005-06 as finalized by the RD Department
has already been circulated to all the BDOs. It was reported by the BDOs that
beneficiary contribution and state share had not yet been received in full. It
was decided to release the pumpset for those beneficiaries against whom both
state contribution and beneficiary contribution have been deposited.
( Action : EE-RD(S) and all
BDOs)
3) All the
BDOs were further requested to complete the projects of setting up shallow tube
well for irrigation, including power connection immediately.
( Action: all BDOs
)
4. SW AND
SE AND GENERAL MATTERS:
1) All the vacant
quota of BHP should be filled up in every Block in consultation with concerned
Panchayat samiti/BAC. If the quota of a village/GP is vacant, then it should be
given 15 days time to fill up the vacancy. Thereafter, Panchayat Samiti/BAC
concerned shall be competent to divert the vacancy to some other GP/ Village
where quota has already exhausted but eligible disabled persons exist.
( Action : all BDOs
)
2) BDO, Satchand
reported that BHP quota of Satchand Block had not yet been filled up. He has
been advised to take immediate steps to fill up the vacancy by diversion as per
above decision given by Hon’ble SW&SE Minister.
( Action
: BDO, STC )
3) It was reported
that survey report in respect of NOAP and BHP in prescribed format was pending
with all the BDOs. Survey should be completed and submitted by 8/1/07. It was
pointed out that the survey should cover all the eligible old and aged persons
and in case of BHP, name and percentage of disability is to be clearly
indicated.
( Action : all BDOs
)
4) DISE informed
that 134 fully blind persons have been identified and the list had been
submitted to the Government.
5) Out of the new 14
AWCs, 2 have been opened. Site selection for the others have to be made by the
BDOs concerned. 10 SECs are to be converted into AWCs.
( Action by BDOs and DISE
)
6)
Literacy survey : Enrolment
drive for the un-enrolled children (3 to 5 years) was reported to be underway.
He was requested to intimate the achievement status.
( Action by DISE South
)
7) NFBS : All eligible pending cases
pertaining to the period upto last one year are to be sent to the Govt. It was
informed that Rs.1.60 lakhs have been scnctioned for Bokafa Block.
( Action by BDOs and DISE South
)
8) Construction of AWCs : Construction of
all the AWCs are to be started by all the BDOs. UC to be submitted for the AWCs
where constructions have been completed. The points to be noted are (i) Ramp to
be provided, (ii) truss to be painted before fitting, (iii) only RD materials to
be used in the construction works in respect of materials supplied by RD, (iv)
Model of AWC may be changed, but store and kitchen to be provided invariably.
Separate kitchen may also be provided for AWCs, (v) EE, RD will arrange to
supply revised model estimate within an amount of Rs.1.75 lakhs by 20/01/07 to
all BDOs.
( Action by all BDOs
)
5. PHE:
1) All the
BDOs were requested to inform the AE (PHE) of concerned Block area in writing to
extend pipeline and to DGM of TSECL for extension of power connection upto newly
constructed Women Sanitation Complex, Brooder house, AWC & School
immediately. BDOs informed that :-
AMP- Pipeline extension of PHE and
power line not given at WSC.
KBK- Pipeline extension and Power
connection not made to WSC. BDO to sent request letter.
RPC & STC- A requesting letter was
sent to AE, SBM(PHE), but no action is taken up by PHE to extend pipeline up to
WSC.
RJN – Pipeline extended up to 4/5 nos
WSC. Request letter sent to Power Dept. but no action has yet been taken.
KLA- Request letter sent to extend
pipeline to WSC at Killa and at Jalema Basanta Para JB School, but till now no action
has been taken up.
MTB – 2 nos WSC completed, but PHE
pipeline not extended.
KBN – 3 nos. WSC completed and 1(one)
in progress at DIET college. Pipeline connection and power line are not given.
HRM- Reservoir work to be started.
Thereafter, PHE connection will be taken.
BKF- Pipe line to be extended to B.C.
Manu Brooder House.
(Action : EE, PHE, Belonia/Udaipur ; AGM,
TSECL, South and all BDOs)
2) Growth Centres
:
Garjee Growth Centre: Two nos. DTW sinking for irrigation
purpose is to be done by WR Dept. Fund placed with PHE- to be completed by
Feb.’07.
Kowaifung Growth Centre: 3 water tanks and pipeline extension
are incomplete. Tile work is in progress. To be completed by Jan,’07
end.
Silachari Growth Centre: 2 water tanks are 80% complete. To be
completed by Jan,’07 end.
Debipur Growth Centre: EE, PHE, Belonia is to prepare the
estimate of pipeline extension immediately.
Manughat and Chotakil Growth
Centre: Estimate for
IRP at Chotakil & pipeline extension are to be submitted by 20th
Jan,’07.
(Action: EE, PHE-
BLN/UDP)
6. School Education
Matters:
a. Construction of School
Building:
(1)
District Education Officer, South briefed the construction status of
school buildings taken up in 2005-06 under SSA - total 138 nos completed, 17 nos
in progress and work not started at 1 no school till now at Lailakbari SB School
under Killa Block. DM, South asked BDO KLA is to expedite shifting of TSR camp
out of Lailakbari SB School.
(Action: BDO, KLA &
DEO,(S))
(2) UC for PMGY(Edn) 2004-05 is pending
with BDO Ompi and ZDO(South). BDO,
OMPI will furnish a report about the status of construction of building of
Rangjuha J.B. School.
(Action by BDO, OMP &
ZDO(S))
(3) BDO OMP, RJN, HRM &
STC and EO, Udaipur NP are
requested to submit the pending U/C for the work of school building under SSA
2004-05 immediately as the work has already been completed.
(Action: BDO - OMP, RJN, HRM, STC &
EO, Udaipur NP)
(4) It was informed
that as per estimate of JB School, only 3 nos rooms can be constructed out of
Rs. 6.25 Lakhs given under SSA, whereas as per RD estimate, block was
constructing 6 rooms within the same project cost of Rs. 6.25 Lakhs. DM, South Tripura
requested DEO to take the views of Education Dept. In this regard, no report was
received from Education department. DEO, South is requested to expedite it.
(Action by DEO, South)
(5) DEO, South informed
that under SSA 2006-07, total (a) 88 nos Primary School building will be
constructed, out of which 59 nos in ADC area - fund placed for 63 nos school and
work started in 51 schools. (b) Total 15 nos Upper Primary School building will
be constructed, fund placed for 15 nos and work in progress at 14 nos schools.
(c) 25 nos CRC building will be constructed- fund placed to all, work started
for 23 nos. (d) 10 nos boundary wall will be constructed and fund placed for 10
nos and work in progress at 9 nos.
(6) All SSA matters are to be
briefed to DM by Dy. Director, Education (South). BLEC to communicate the
decisions in writing for DLEC concurrence.
(Action by DEO, South & all
BDOs)
(7) The issue of having no
pucca building from SSA for Khemanand Tilla JB School, Nayan Krishna Sadhu Para
JB School and upgraded Purba Madhya Pilak SB School raised by Chairman, Bokafa
PS in the last development meeting has not yet been clarified. DEO, South is
requested to examine whether the aforesaid 2 schools were included in SSA
(2004-05) plan for school construction. If so, whether fund was placed for
construction of these schools?
(Action by DEO,
South)
b. Creation of Drinking Water Sources
at School – Status :
(1) PMA 2004-05: BDO- RPC & RJN are yet
to complete creation of water sources. They were instructed to clarify the
pendency. Pendency status in details along with the name of IO and indication of
likely completion darteto be given.
( Action by BDO, RPC/RJN
)
(2) PMA 2005-06 : BDO- STC, RJN & HRM
will take immediate steps to complete the outstanding works and submit UC. UC is
also pending with BDO – KLA & KBK. They shall submit UC without further
delay.
( Action by BDO, STC/ KLA/ KBK
)
c. Construction of Toilet at Schools :
(1) Total target for
construction of Toilet was 90 nos. Schools under SSA 2005-06 and till now, 84
nos toilets are completed. BDO, RJN reported that construction could not be
started due non-availability of road. BDO, HRM & RPC reported that works had
already been started.
(2) BDO- KBK, OMPI, BKF, RJN, HRM, STC & RPC
shall submit UC under SSA 2005-06 immediately.
(3) All
the BDOs were directed to take construction of Toilet at schools, not having
toilet facilities, immediately out of unspent TSC fund and the list of such
schools where toilet will be constructed should be sent to DM, South with a copy
to concerned HM of School and DEO (South).
(Action: all BDO)
7. Drinking Water
Sector:
A. BDO– RPC informed
that project taken up at 44 identified
habitations at
Banaraipara is completed.
B. PMGY(DW) 2005-06:
(1)
Creation of sources for coverage of NC/PC Habitations lying incomplete
with BDO- KLA-2, KBK-4, BKF-1, HRM-1 and
EE(RD), South- 1. They are requested to complete the works by Jan,’07
positively.
(2) UC is pending
with BDO- KLA, KBK, RJN, HRM, STC, RPC
& SBM. They are requested to submit UCs immediately.
C. ARWSP: (i) Creation of Innovative Type
drinking water sources under ARWSP 2005-06 is pending with BDO – KLA, AMP, KBK, BKF, HRM, STC, RPC
& EE(RD). BDO, BKF will provide only on receipt of subscribers. BDO, HRM
will suspend the work at Som Para (Dakshin Sonaichari).
(ii) All BDOs are to expedite the
creation of drinking water sources taken up under ARSWP – 2006-07 so as to
complete them by Jan’07. (Action: all
BDOs)
(iii) All the ongoing projects taken up
under SGRY, PMs Announcement, SSA,
ARWSP, PMGY(DW) taken up during
the year 2005-06 should be completed by end of Jan,’07 positively.
(Action:
All BDOs)
(iv) BDOs
have been advised to prepare Scheme-wise pendency status and submit to DM’s
office within Jan,’07.
( Action by All BDOs
)
D. Swajaldhara:
1) Swajaldhara 2003-04 : Out of 814, 812
projects have been completed and 2 projects i.e. Mini DTW at Purba Malbassa
under AMP Block and another at Kalachara under STC Block are in progress. ( Action by BDO, AMP/STC
)
2) Swajaldhara 2004-05 : (i) Out of 12
projects, 8 have been completed and 4 are in progress. The BDOs were instructed
to expedite completion of the remaining projects.
( Action by BDO,
KLA/AMP/RPC/STC)
3) Swajaldhara 2005-06 : (i) BDO, KLA
will not be able to submit proposal against one balance target Hence, his quota is diverted to AMP
Block. BDO, AMP shall send VWSC resolution at the earliest.
( Action by BDO,
KLA/AMP)
(ii) BDO, HRM & RPC are to submit
details of beneficiary contribution against balance one project each, so that
fund can be sanctioned immediately. If necessary, the location may be changed.
( Action : BDO, HRM/RPC
)
(vi) It was instructed to start the works
immediately, where works are yet to be started and complete within
March,’07.
( Action by all BDOs
)
(vii) General guidelines were given by
DM(S) in the execution of Swajaldhara projects (a) JEs attached to the Blocks
will be entrusted with the execution of the projects, (b) All the balance works
with the JE of Swajaldhara will be taken over by the JEs of the Blocks, (c) 10%
of the cost for distribution pipline shall be taken from the beneficiaries and
the amount should be kept as corpus fund in the savings account of VWSC to meet
maintenance expenses.
( Action by All BDOs)
11.
Housing:
(1) All BDOs should take up the construction
& Up-gradation houses under IAY 2006-07 expeditiously.
(Action by all
BDOs)
(2) EE, RD is to confirm the weight of
GCI sheets given for IAY houses. Also, check whether giving GCI sheets by number
for exact 24 sheets will lead to some saving, allowing beneficiaries to get some
more cash. (Action: EE,
RD(S))
(3) IAY houses to be
allocated to all families who were attacked in retaliation by extremists in
Dhanrai para, OMP block. Special target for this purpose has been given. BDO,
Ompi to start the work immediately. (Action by BDO,
OMP)
12. Road
Connectivity:
BDOs had
been requested to take up the 3(three) nos roads to connect unconnected paras
per block out of RD funds. Monthly progress report on this matter should be
submitted by all BDOs.
(Action : All
BDOs)
13. MPLADS:
(1) BDO Rajnagar informed that
construction of High school building at U.B.C.Nagar started and will be
completed by Jan’07. (Action: BDO RJN)
(2) BDO BKF informed that
construction of 300 seated community Hall at Muhuripur is in progress. He was
requested to submit part UC for said project.
(Action by BDO BKF)
(3) BDO, BKF was requested to
complete the construction works at Jolaibari PHC following the instructions
given by DM, South immediately.
(Action by
BDO-BKF)
(4) All the sanctioned projects prior
to 2005-06 under MPLADS should be completed on priority basis giving special
emphasis & all UC to be submitted by the BDO.
(Action by all concerned
BDOs)
(5) BDO Hrishyamukh was asked to submit the
pending UC against the 2(two) nos completed works in the last meeting, but the
matter was found pending. He was further asked to submit UC immediately.
(Action by BDO
HRM)
(6) EE, RDD, South informed that
the problem of joyce has been solved in respect of the construction of Foot
Bridge at Barkhola, Bijoynagar GP under STC Block. DM, North will be requested
again to place the addl. Fund without further delay.
(Action by O/C, Dev and EE, RDD,
South )
14. BADP:
(1) The pending works of
2nd phase fund of 2005-06 shall be completed without further delay.
After completion, U/C should be sent immediately. (Action by BDO – KBK, AMP, RPC &
STC)
(2) It was requested to prepare
estimate for project proposals approved for the year 2006–07 under BADP and
start execution out of fund placed recently. BDO RPC, HRM, STC & RJN
informed that the required estimates are under preparation.
(Action by BDO RJN/ HRM/RPC/STC
& EE, RD, South)
(3) BDO Karbook informed that
construction work of processing centre for Bamboo cane activities started at
Khuripara. BDO, KBK was asked to take immediate steps for completion of works by
Jan’07.
(Action: BDO,
KBK)
(4) BDO Karbook also informed that brick soling
work from Nabajoypara to Simbhua para (L–3 KM) has not been started, as NBCC has
taken up the road under PMGSY. BDO KBK was requested to submit alternative
proposal.
(Action:
BDO,KBK)
(5) U/C is pending since long time with BDO RJN
for construction of Gabtali High School (2004–05), BDO BKF for construction of
Market stall at Debdaru Bazar (2005-06) & BDO STC for construction of addl.
classroom at Gardhang High School (2004-05), though works have already
completed.
(Action : BDO
RJN/BKF/STC)
(6)
Proposals for creation of Model Village as per prescribed format shall be
submitted immediately on high priority, as it has unnecessarily got delayed.
(Action: BDO, HRM/RJN/STC/RPC &
KBK).
15. DRDA:
1) All BDOs to submit action taken report on Agenda Note of
DRDA discussed in Monthly Development Meeting to PD, DRDA(S) with a copy to DM, South
by 21st of every month.
( Action by All BDOs
)
2) PD DRDA
informed that SGRY expenditure till Dec. end is less than 50% in respect of
Killa, Amarpur, Karbook and Ompi Block. Fund and rice is available. The four
blocks in particular and other blocks in general were instructed to expedite
expenditure.
( Action by All
BDOs)
3) BDO, RPC
could not confirm lifting of the
un-lifted rice of 147.40 Kg during the year 2005-06. BDO Rupaichari was
instructed to lift the un-lifted rice of previous year on priority basis. BDO
RJN was asked to confirm utilization of the balance unlifted amount of rice by
this month positively and make the balance nil.
( Action by BDO, RPC/RJN
)
4) UCs of
various advances like SGRY, SGSY Infrastructure, SGSY Training, BPL Survey, CBCS
etc. were still lying outstanding with BDOs. All BDOs were requested to submit
the adjustment as well as UC as per requisite format immediately without
fail.
( Action by All BDOs
)
5) UC of SGRY 2004-05 is still
pending with BDO- KBK, OMPI, BKF, STC & HRM. The BDOs will take immediate
steps to clear the pendency of UC.
( Action by BDO,
KBK/OMP/BKF/STC/HRM )
6)
Online data entry of SHGs should be updated regularly and a monthly
progress report to be sent to DRDA(S) regularly as per format in the agenda
note. All BDOs were requested to send the proposals of defunct/ non-traceable
SHGs to the DRDA(S) for weeding out from the list of SHGs.
( Action by All BDOs
)
7) BDO, MTB/KBN/BKF were requested to
complete the survey of the selected beneficiaries for Rural Housing Scheme and
send to DRDA(S) immediately for sponsoring the cases to banks for finance. PD
DRDA(S) was requested to sponsor the pending cases of other blocks
immediately.
( Action by PD, DRDA and BDO, MTB/KBN/BKF
)
8) 10% ADC Share of SGRY:- (i) Diversion
projects under RPC and KLA have been completed by EE, RDD, South. He will
complete the diversion project under STC within Feb ‘07 and another diversion
project under STC within Jan’07.
( Action by EE,
RDD)
(ii) Those BDOs, who have not yet started the works
under SGRY 10% ADC share, are instructed to start
immediately.
(iii) BDOs were requested to submit proposals
under 10% ADC share 2006-07 giving priority to Electrification and
irrigation.
9)
DM(South) instructed the BDOs to ensure that Extension Officers
(Panchayat) visit each GP and submit detailed report on the activities and
progress of scheme implementation. Format used for reporting progress of works
of the Blocks may be used for the purpose.
10) BDOs were instructed to submit GP-wise
financial statement by 20th of every month to DM’s office on a
regular basis along with other reports/returns, stating the balance fund
available under SGRY & PDF separately.
11) BDOs were instructed to
furnish full details of TC/DC paid by them since 2001-02 to DM’s office to
prepare status report and reconciliation.
( Action by All BDOs )
16. SRE:
1) BDO-OMPI,
KBK, BKF, AMP, KLA, STC & RPC have been requested to expedite the
construction works for alternative accommodation of security forces for early
completion. All works taken up during the year 2005-06 & 2006-07 should be
completed by Jan’07 positively. BDO Ompi assured that construction of camp at
Rambabu para will be completed by Jan’07.
(Action by BDO,
OMPI/KBK/BKF/AMP/KLA/ RPC)
2) BDO RPC was asked to submit an estimate
for maintenance of kitchen room of Bagmara TSR Camp immediately.
(Action by BDO, RPC)
3) All the BDOs were requested to submit the
copies of work order, Vouchers and UCs in respect of SRE works, as the above
papers are to be submitted to the Home Ministry, Govt. of India for
re-imbursement claim.
(Action by all
BDOs)
4) Vice-Chairman of HRM Panchayat
Samiti requested DM, South to construct a water reservoir for drinking water at
Matai and South Amjadnagar BOP. BDO HRM is requested to send a formal proposal
for the same with requirement of fund under SRE. No report yet received from BDO
HRM. He is asked to submit it immediately.
(Action by BDO –HRM)
5) DPO (South) will arrange to supply
latest estimate of Panchayat Ghar circulated by Panchayat Deptt. to all the BDOs
so as to use it for construction of barracks as alternative accommodation for
security forces occupying govt. buildings.
( Action by DPO, South
)
8) BDOs will intimate fund requirement
under SRE to DM’s office immediately. They will cover BOPs/Security Camps with
Water Sources on priority.
( Action by All BDOs )
17. Block Building, minor works etc.
Matters:-
1) DM, South
requested Executive Engineer, RDD(S) to expedite the construction work of
Kakraban Block building, using balance required amount released under BADP
2006-07.
(Action by EE, RDD,
South)
2) BDO-RJN & RPC were
requested to complete maintenance work/ addl. building works early.
(Action: BDO
RJN/RPC)
3) EE (RDD) South and BDO STC, RJN,
RPC & AMP are requested to submit UC immediately.
(Action by EE, RDD &
BDO-STC)
4) BDOs to give requisition/estimates for
repair and maintenance of Block Building / govt. quarters.
(Action: All
BDOs)
5) Site
Specific estimate to be prepared by EE,RD for BKF block by following HRM model
and not STC model. Matter be given high priority.
(Action by EE,
RDD(S))
18.
TSC:
1)
Survey of IHHL (house to house) is to be completed by all BDOs and
complete report is yet to be submitted by BDO Matabari & Killa. They shall submit it by 20th
Jan 07 positively, otherwise strict action shall be taken against them.
(Action : All BDOs)
2) All the BDOs are asked to submit Field
Survey report on hygiene behaviour and education practices (regarding usage of
toilets, washing hand after defecation and before eating meals, cutting of nails
etc) given on page 79 of Agenda note in the new FORMAT. BDO Karbook, Kakraban, Killa, Rajnagar
& Satchand have not submitted the report. They are asked to submit it
immediately.
(Action: BDO KBK, KBN,
KLA, RJN & STC )
3) BDO-MTB, BKF, HRM, KBN should
take appropriate steps for early completion of construction work of Woman
Sanitary Complex (WSC) on priority basis. Beneficiary contribution for WSC may
be arranged out of own revenue of gram-Panchayat or Panchayat Samiti/BAC.
(Action by BDO - MTB, BKF, HRM, STC,
KBN)
4) BDO-Matabari
should take immediate steps to collect the beneficiary contribution for
completion of Garjee WSC.
(Action by BDO, MTB)
19. Panchayat Matters:
1) BDOs were
requested to take up construction work of selected Panchayat Ghar-cum-library as
per fixed target for the year 2006-07. Monthly Progress report in connection
with Panchayat Ghar-cum-library should be submitted regularly. (Action : BDO-KLA, OMP, KBK, BKF, STC, RPC
& RJN )
2) All the BDOs were requested to submit the
pending UC of PDF for all the previous years up to 2005-06.
(Action: All
BDOs)
3) After visit of
2/3 Panchayat offices and verification of Cash Book/other records in Ompi area,
DPO(S) reported that good amount were lying in GP Account as unspent. BDO, Ompi
as also other BDOs were instructed to take appropriate steps to utilize the GP
funds immediately. ( Action : All
BDOs)
20. Welfare Works for SC, ST, OBC
& RM:
1) All BDOs were requested
to complete all ongoing works of 2005-06 by Jan’07 and to submit the U/C as per
enclosed list with agenda notebook of TW.
(Action by all
BDOs)
2) BDOs should
submit the detail progress of Rubber plantation and raising of nursery, for
which fund was placed to BDOs. Name of location, area covered, no. of
beneficiaries, status of plantation, expenditure and next action to be taken up
should be mentioned in the report for onward submission.
(Action by all BDOs)
3)
Target under SCA fixed by Tribal Welfare Dept for blocks were
re-circulated among the BDOs. They were requested to submit proposal immediately
as per target for sending to TW Directorate for placement of
fund.
(Action by all
BDOs)
4) BDOs
are requested to submit a progress report on re-grouped villages every month,
whatever works they have taken up, for onward submission. The report should be
submitted in the format given in Agenda Booklet of TW.
(Action by all
BDOs)
22.
Miscellaneous:
1) DM, South requested BDO
Bokafa, Karbook and Satchand to take preliminary steps to start the newly
sanctioned Growth Centre at Debipur, Chellagang and Manughat/Chottokhil. Fund
will be placed to all Implementing agencies immediately.
(Action: BDO-BKF, KBK &
STC)
2) BDO
Satchand and Matabari were requested to take up construction of workshed for
Potters under SGRY fund immediately, as Govt. is pressing hard. An action taken
report is to be submitted.by BDOs.
(Action :
BDO-MTB/STC)
3) All
Development works should be posted on website and this should be updated
every month.
(Action by all BDOs & DIO,
South)
4) All BDOs
were requested to submit the latest numbers of RAMP constructed in the Block area in
all Govt. institutions as per supplied FORMAT for onward submission by
25th of every month along with monthly progress reports.
(Action by all
BDOs)
5)
BDO RJN,
OMP, MTB, STC & RPC should form the Village level Disaster Management Plan
immediately. (Action : BDO RNJ, OMP,
MTB, STC & RPC)
6)
All BDOs
should pay adequate attention to achieving the goal of 9-point programme.
7)
BDOs are
to spend funds placed under health awareness schemes for wide publicity of
health schemes giving priority to JSY.
8)
All
the BDOs must furnish the Monthly
Progress Report as per formats given in Agenda
Note Book
by 22nd to 25th Jan 07 without fail.
9)
The next development meeting will be held
on 05/02/07 at 1.00 PM at Killa RD Block after conclusion of field visit at
different parts of Killa R.D. Block from
9.00 am to 12.00 noon. BDO KILLA is requested to make sitting arrangement
etc. for the meeting. All the BDOs are requested to assemble at Udaipur Circuit House at 9.00 am sharp for starting field visit
of various development works on way to
KILLA Block.
The meeting ended with
thanks to all.
Sd/-
29.01.07
( P. Agarwal )
District Magistrate
& Collector
South Tripura,
Udaipur
GOVERNMENT OF
TRIPURA
OFFICE OF THE DISTRICT MAGISTRATE &
COLLECTOR
SOUTH TRIPURA :
UDAIPUR
No. F. 9 (1)-DM/S/DEV/2006-07/952
Udaipur, the 29th
January, 2007
To,
1.
The ADM,
South Tripura, Udaipur.
2.
The
Project Director, DRDA, South Tripura, Udaipur.
3.
The
Secretary, DTZP, Udaipur.
4.
The
District Planning Officer, South Tripura.
5.
The
Deputy Director, Education, South Tripura, Udaipur.
6.
The
District Inspector, SW & SE, South Tripura, Udaipur.
7.
The
Executive Engineer, RD Division, South Tripura.
8.
The
Executive Engineer, PHE, Udaipur/Belonia, South Tripura.
9.
The
Executive Engineer, (WR) Division, Udaipur
10.
The
Executive Engineer, (WR) Division-IV, Belonia, South
Tripura.
11.
The
Member Secretary, DWSC, South Tripura.
12.
The Sub
Divisional Magistrate, Udaipur/ Amarpur/ Santirbaazar/ Belonia/ Sabroom.
13.
The Block
Development Officer(s), Matabari/ Kakraban/ Killa/ Amarpur/ Karbook/ Ompi/
Bagafa/ Rajnagar/ Hrishyamukh/ Satchand/ Rupaichari.
14.
The
Officer in-Charge, General Section, DM’s Office, South Tripura.
Copy to :
1.
The PS to
the Chief Secretary, Govt. of Tripura for kind information of Chief Secretary.
2.
The
Commissioner, RD/ Education, Govt. of Tripura for kind
information.
3.
The
Director (Projects), Govt. of Tripura for information.
4.
The DIO,
NIC, South Tripura (in soft copy) for hosting the meeting minutes on the South
Tripura website.
Sd/-
29.01.07
( P. Agarwal )
District Magistrate
& Collector
South Tripura,
Udaipur
ANNEXURE - A
List
of participants:
-
|
Sl.
No. |
Name of
Official |
Designation |
|
1.
|
Sri. P.
Agarwal |
DM
& Collector, South Tripura |
|
2.
|
Sri. S.
Reang |
ADM
& Collector, South Tripura |
|
3.
|
Sri. A.
Chandra |
PD,
DRDA, South Tripura |
|
4.
|
Sri. S.
Sarkar |
DPO/DWO,
South Tripura |
|
5.
|
Sri. K.
Tripura. |
EE,
RDD, South Tripura |
|
6.
|
Sri. S.P.
Chakraborty |
M/Sec.,
Swajaldhara |
|
7.
|
Sri. N.C.
Debnath |
DIS,
South Tripura |
|
8.
|
Sri.
A Debbarma |
DISE,
South Tripura |
|
9.
|
Sri
A. Debnath. |
BDO,
Matabari. |
|
10.
|
Sri A.
Chakma. |
BDO, Killa.
|
|
11.
|
Sri D.
Debbarma. |
BDO, Karbook.
|
|
12.
|
Sri A.
Saha. |
BDO,
Bokafa. |
|
13.
|
Sri S.
Bandopadhyay. |
BDO,
Rajnagar. |
|
14.
|
Sri A.K.
Roy. |
BDO,
Hrishyamukh. |
|
15.
|
Sri P. K.
Deb. |
BDO,
Satchand. |
|
16.
|
Sri D.
Debbarma. |
BDO,
Ompi. |
|
17.
|
Sri S.
Debbarma. |
BDO,
Rupaichari. |
|
18.
|
Sri. A. SuklaDas.
|
BDO,
Kakraban. |
|
19.
|
Sri. P.
De |
BDO,
Amarpur |
|
20.
|
Sri. B.
Saha |
ARO,
Planning |